Surveying Lab

Organizational structure of the team surveying

Staff

1- Surveying engineer: (3)

2- Civil engineer: (1)

3- Surveyor: (4)

Appliances and equipment

1- DGPS Type (Topcon- GR-3) -1-

2- Total Station Type (Topcon reflector less-7500) -1-

3- Total Station Type (Topcon 235) -2-

4- Total Station Type (Lieca 1203) -1-

5- Total Station Type (Sokkia) -1-

6- Normal Level Type (Topcon) -1-

7- Navigator GPS Type (Garmin 12,72 78)

Topcon-7500

GR-3

Lieca 1203

Topcon235

Navigators GPS

Projects that have been implemented:

Period

Type of the work

Location

1989 and still working

1- Contour works
2- Installation projecting works
3- Levels of excavating works
4- Projecting works of the pipelines path and making cross section
5- Survey Railway Project

Baghdad - Iraq

1- Surveying works for Dams Project.
2- Surveying works of Wear Project within the dams in Kurdistan Region
3- Surveying of Switch
4- Surveying of Roads
5- Topographic Surveying of Drains, Branches and canals
6- Surveying under water
7- Pipe lines for Ministry of Oil
8- Observation of Control points by DGPS Static method

Kurdistan - Iraq

 

 

Mousl - Iraq

 

Kurdistan - Iraq

 

South of Iraq

 

South of Iraq

Another executed work

Carrying out topographic surveys to Hill Ksabh dam in Salahuddin carry out topographic surveys to Alaat dam in Salahuddin carry out an underwater survey l in the province of Sulaymaniyah Darbandikhan. carry out topographic surveys in the province of Sulaymaniyah Qadrickrm. carry out designs for a road in capable of generosity in the province of Kirkuk. carry out a survey of gas station intersection project in Mosul. Project design work involved the intersection of gas station in Mosul. carry out the survey for the sewage network in terms of Depkh in Nineveh carry out topographic surveys to fill Alaat Salahuddin province. of the company Eden Energy and the Turkish construction carry out topographic surveys to meet the steel in the province of Sulaimaniya, carry out topographic survey of the poultry project Smeal area of 6000 dunums carry out the survey to eliminate sewage network in the province of Nineveh Baaj carry out the survey in terms of the sewage network in the province of Nineveh, Piper carry out the survey in terms of network streams Rabia, in Nineveh.

Completed Projects

KAR Group and Ministry of Water Resources - KRG

Included conducting surveys, topographic, soil investigations...

Read more

Soil Investigations for KAR Group

 

Masatha Company carried out soil investigations for Sub Station #6...

Read more

Soil-Oil Investigation for Hemn Group

Masatha company carried out the investigation of soil-oil tanks in Kourkosk...

Read more

Soil Investigations for Qwan Company

Masatha Company carried out soil investigations for Bazian refinery project...

Read more