PROJECTS

 

Completion of a feasibility study for the project SUQ Al-SHOUKH as a (sub-contractor to the Dijla Bureau Engineering) for the Ministry of Water Resources and our work included soil survey for agricultural purposes, basic design for irrigation and drainage networks, preparation for the bill of quantities, preparation of the environmental study, hydrological study, and preparation of financial and economic feasibility study.

 

1. Carried out work for KHANAS dam design (sub-contractor to KAR Company) and for the Ministry of Water Resources in Kurdistan region. It included a commitment to conduct surveys, topographic, soil investigations, survey geophysical, geological study, hydrological study, detailed design of construction and Earth dam with all the accompanying facilities.

 

2. Carried out the investigation of the soil-oil tanks farm in Kourkosk area For the Hemn Group Company.

 

3. Carried out the soil investigations for Bazian refinery project (phase II) for the Qwan Company.

 

4. Carried out the soil investigation work for Bdra Gas Pipe Line project (360 KM) (as partner with LNABAA AL YAQEEN COMPANY) for the GAS PROM Company.

 

5. Carried out soil investigation work for ABO TAQYA dam (as partner with WALIED SUBHY BUREAU) for the benefit of the Ministry of Water Resources.

 

6. Carried out the soil investigations for 3 substations in Barda Rash for the benefit of KAR Company, the end user of the client is the Ministry of Electricity in Kurdistan Region.

 

7. Carried out the soil investigations for Xurmala Gas power plant for the benefit of KAR Company.

 

8. Preparation design for the Qadiir Karam dam as a sub-contractor to (KAR Company) and for the Ministry of Water Resources in the region and included a commitment conduct surveys topographic, soil investigations, survey geophysical, geological study, hydrological study, the design of the approaching road, the detailed design of the Earth dam accompanying facilities.

 

9. Preparation design for the Estell dam as a sub-contractor to (Dijla Bureau Engineering) and for the Ministry of Water Resources and included a commitment conduct surveys topographic, soil investigations, survey geophysical, geological study, hydrological study, the design of the tourism complex, the detail design of the Earth dam accompanying facilities and feasibility study.

 

10. Carrying out soil investigation work for Dearalok dam for the benifit of ELC - Electroconsult S.A.P (ongoing).

 

11. Carrying out the construction tests for the Erbil Refinery No. (3) (Ongoing).

Completed Projects

KAR Group and Ministry of Water Resources - KRG

Included conducting surveys, topographic, soil investigations...

Read more

Soil Investigations for KAR Group

 

Masatha Company carried out soil investigations for Sub Station #6...

Read more

Soil-Oil Investigation for Hemn Group

Masatha company carried out the investigation of soil-oil tanks in Kourkosk...

Read more

Soil Investigations for Qwan Company

Masatha Company carried out soil investigations for Bazian refinery project...

Read more